01
New work area preparation
For an office, work room, or operating location that needs computers, peripherals, connectivity, and readiness notes.
- Device and peripheral requirement list.
- Connection point and access networking notes.
- Functional readiness and handover checklist.
02
Device and network refresh
For work environments that need device replacement, relocation, or adjustment without losing important records.
- Initial device condition inventory.
- Change and functional check agenda.
- Final status notes and follow-up items.
03
Maintenance coordination
For computer, printer, scanner, communication equipment, or connection issues that need logging and follow-up.
- Issue log and impact priority.
- Coordination with relevant technical parties.
- Status, outcome, and closure notes.
05
Print and scan coordination
For printer, scanner, connection, usage location, basic function check, and output device follow-up needs.
- Output device and accessory requirements.
- Installation or checking agenda.
- Issue and follow-up notes.
06
Move, add, change
For workstation moves, added devices, connection point changes, or technical record updates.
- Changed device and connection list.
- Work sequence and involved parties.
- Equipment register updates.